Interconnection Request and Equipment Application

Interconnection Request And Equipment Information Form

  • Section 1.0 Customer Information

  • if the customer-generator is not located on land owned by the applicant, the applicant must provide a copy of the document authorizing the customer-generator to be installed on the property that has been registered on the title of the property.
  • Section 1.1: Technical Designer Information (To be filled out with information regarding the company and person responsible for the technical design of the installation)

  • Section 1.2: Electrical Contractor Information (To be filled out with information regarding the company who will obtain the electrical wiring permit and the site contact person responsible for the electrical installation)

  • Section 2: Energy Reconciliation

  • MM slash DD slash YYYY
  • Section 3: Customer-generator's Existing RELC supply

  • Primary RELC Account No.
  • Secondary RELC account No.
  • If you intend to SGO against more than one account, please capture meters on a separate piece of paper and include with your application form.
  • Section 4: Proposed Interconnection Details

  • Section 5: Generating Equipment Information

  • Section 5.1: Synchronizer Information (Synchronous Generators)

  • Section 5.2: Solar Modules (Where Applicable)

  • Manufacturer specification sheets and clarification compliance reports shall be provided for all solar modules in addition to the interconnection request form. Equipment that does not have a recognized factory certification marking shall be subject to field evaluation.
  • Section 5.3: Inverter Information (Where Applicable)

  • kVakW
  • ReadingkW
  • Single PhaseThree Phase
  • Manufacturer specification sheets and clarification compliance reports shall be provided for all solar modules in addition to the interconnection request form. Equipment that does not have a recognized factory certification marking shall be subject to field evaluation.
  • Section 5.4: Rapid Shutdown Equipment (Where Applicable)

  • Manufacturer specification sheets and clarification compliance reports shall be provided for all solar modules in addition to the interconnection request form. Equipment that does not have a recognized factory certification marking shall be subject to field evaluation.
  • Section 6.0: Interconnection Transformation and Fuse Information (Where Applicable)

  • Single PhaseThree Phase
  • TypeSizeSpeed
  • DeltaWyeGround Wye
  • Section 6.1: Interconnection Circuit Breaker Information (Where Applicable)

  • Section 6.2: Protective Equipment (Complete All Applicable Items; Where Requested, a Separate Sheet Shall be Provided With The Manufacturer's Product Information)

  • a. Provide manufacturer's information for each protective function
  • Provide manufacturer's documentation for protective functions:
    • Under/Over Voltage
    • Under/Over Frequency
    • Anti-islanding
    • Over-Current
  • b. Range of available settings for each protective function
  • Provide list of protection functions with available ranges of protection setting for tripping and shutdown along with time delays.
  • c. Proposed settings (set point and times)
  • Provide list of protective functions with settings for tripping or shutdown along with time delays ,i.e., high voltage 127V, time delay 0.1 sec.
  • Section 7.0: Required Documentation (Three copies of each required)

  • a. Electrical One-Line Diagram
  • A single-line diagram showing the electrical relationship and descriptions of the significant electrical components such as the generator inverters, cables and wiring, switches, meters , transformers, circuit breakers, with operation voltages and ratings.
  • b. Manufacturer's Information and Approvals
  • Provide manufacturer information sheets and certification compliance reports for equipment's such as inverters, generators, solar modules, rapid shutdown devices, combiner boxes, DC disconnect switches, and DC optimizers
  • c. Equipment Labelling
  • Provide a detailed list of all permanently installed labels indications label designations, label dimensions, label background color, label latter color, label letter height , and label verbiage.
  • d. Site Plan
  • Provide site plan showing the physicals arrangement of the major equipment , including generating equipment, transformers, switches, control panels, the customer's existing metered service and the interconnection with RELC's distribution system. Include the civic address, references, rtc. Provide civic address.
  • e. Protection Device Data
  • For all protective devices used to protect and control the interconnection, please provide proposed protective device settings, circuit breaker and fuse data and coordination curves, and a description of how the protection scheme is intended to function.
  • f. Point of Contact
  • If the interconnection and start-up process is to be coordinated through a party or individual other than the customer , provide the name , company, address and telephone number of that individual or party with whom the utility is to coordinate the interconnection.
  • I hereby certify that i have reviewed and agree to adhere to 5.8 self-generation Offset and to the best of my knowledge , all information Request and Equipment information Form is true and correct
  • MM slash DD slash YYYY
  • Send Completed Form to:
  • Riverport Electric Light Commission
    Box 100, 3308 Hwy. 332
    Riverport, NS BOJ 2W0
    Relcommission@eastlink.ca