Interconnection Request and Equipment Application

Interconnection Request And Equipment Information Form

  • Section 1.0 Customer Information

  • if the customer-generator is not located on land owned by the applicant, the applicant must provide a copy of the document authorizing the customer-generator to be installed on the property that has been registered on the title of the property.
  • Section 1.1: Technical Designer Information (To be filled out with information regarding the company and person responsible for the technical design of the installation)

  • Section 1.2: Electrical Contractor Information (To be filled out with information regarding the company who will obtain the electrical wiring permit and the site contact person responsible for the electrical installation)

  • Section 2: Energy Reconciliation

  • MM slash DD slash YYYY
  • Section 3: Customer-generator's Existing RELC supply

  • Primary RELC Account No.
  • Secondary RELC account No.
  • If you intend to SGO against more than one account, please capture meters on a separate piece of paper and include with your application form.
  • Section 4: Proposed Interconnection Details

  • Section 5: Generating Equipment Information

  • Section 5.1: Synchronizer Information (Synchronous Generators)

  • Section 5.2: Solar Modules (Where Applicable)

  • Manufacturer specification sheets and clarification compliance reports shall be provided for all solar modules in addition to the interconnection request form. Equipment that does not have a recognized factory certification marking shall be subject to field evaluation.
  • Section 5.3: Inverter Information (Where Applicable)

  • kVakW
  • ReadingkW
  • Single PhaseThree Phase
  • Manufacturer specification sheets and clarification compliance reports shall be provided for all solar modules in addition to the interconnection request form. Equipment that does not have a recognized factory certification marking shall be subject to field evaluation.
  • Section 5.4: Rapid Shutdown Equipment (Where Applicable)

  • Manufacturer specification sheets and clarification compliance reports shall be provided for all solar modules in addition to the interconnection request form. Equipment that does not have a recognized factory certification marking shall be subject to field evaluation.
  • Section 6.0: Interconnection Transformation and Fuse Information (Where Applicable)

  • Single PhaseThree Phase
  • TypeSizeSpeed
  • DeltaWyeGround Wye
  • Section 6.1: Interconnection Circuit Breaker Information (Where Applicable)

  • Section 6.2: Protective Equipment (Complete All Applicable Items; Where Requested, a Separate Sheet Shall be Provided With The Manufacturer's Product Information)

  • a. Provide manufacturer's information for each protective function
  • Provide manufacturer's documentation for protective functions:
    • Under/Over Voltage
    • Under/Over Frequency
    • Anti-islanding
    • Over-Current
  • b. Range of available settings for each protective function
  • Provide list of protection functions with available ranges of protection setting for tripping and shutdown along with time delays.
  • c. Proposed settings (set point and times)
  • Provide list of protective functions with settings for tripping or shutdown along with time delays ,i.e., high voltage 127V, time delay 0.1 sec.
  • Section 7.0: Required Documentation (Three copies of each required)

  • a. Electrical One-Line Diagram
  • A single-line diagram showing the electrical relationship and descriptions of the significant electrical components such as the generator inverters, cables and wiring, switches, meters , transformers, circuit breakers, with operation voltages and ratings.
  • b. Manufacturer's Information and Approvals
  • Provide manufacturer information sheets and certification compliance reports for equipment's such as inverters, generators, solar modules, rapid shutdown devices, combiner boxes, DC disconnect switches, and DC optimizers
  • c. Equipment Labelling
  • Provide a detailed list of all permanently installed labels indications label designations, label dimensions, label background color, label latter color, label letter height , and label verbiage.
  • d. Site Plan
  • Provide site plan showing the physicals arrangement of the major equipment , including generating equipment, transformers, switches, control panels, the customer's existing metered service and the interconnection with RELC's distribution system. Include the civic address, references, rtc. Provide civic address.
  • e. Protection Device Data
  • For all protective devices used to protect and control the interconnection, please provide proposed protective device settings, circuit breaker and fuse data and coordination curves, and a description of how the protection scheme is intended to function.
  • f. Point of Contact
  • If the interconnection and start-up process is to be coordinated through a party or individual other than the customer , provide the name , company, address and telephone number of that individual or party with whom the utility is to coordinate the interconnection.
  • I hereby certify that i have reviewed and agree to adhere to 5.8 self-generation Offset and to the best of my knowledge , all information Request and Equipment information Form is true and correct
  • MM slash DD slash YYYY
  • Send Completed Form to:
  • Riverport Electric Light Commission
    Box 100, 3308 Hwy. 332
    Riverport, NS BOJ 2W0
    Relcommission@eastlink.ca
  • Required Documentation
  • Drop files here or
    Max. file size: 50 MB.
      A single-line diagram showing the electrical relationship and descriptions of the significant electrical components such as the generator, inverters, cables and wiring, switches, meters, transformers, circuit breakers, with operation voltages and ratings.
    • Drop files here or
      Max. file size: 50 MB.
        Provide manufacturer information sheets and certification compliance reports for equipment such as inverters, generators, solar modules, rapid shutdown devices, combiner boxes, DC disconnect switches, and DC optimizers.
      • Drop files here or
        Max. file size: 50 MB.
          Provide a detailed list of all permanently installed labels indicating label designation, label dimensions, label background color, label letter color, label letter height, and label verbiage.
        • Drop files here or
          Max. file size: 50 MB.
            Provide a site plan showing the physical arrangement of the major equipment, including generating equipment, transformers, switches, control panels, the customer’s existing metered service and the interconnection with RELC’s distribution system. Include the civic address, references, etc. Provide civic address.
          • Drop files here or
            Max. file size: 50 MB.
              For all protective devices used to protect and control the interconnection, please provide proposed protective device settings, circuit breaker and fuse data and coordination curves, and a description of how the protection scheme is intended to function.
            • If the interconnection and start-up process is to be coordinated through a party or individual other than the customer, provide the name, company, address, and telephone number of that individual or party with whom the utility is to coordinate the interconnection.